当前位置:首页 > 过刊浏览->2026年第52卷第5期
战略驱动下油田绿色退出与系统重构规划研究——以华北油田雄安新区为例
Strategically driven oilfield green withdrawal and system reconstruction planning: A case study of Huabei Oilfield in Xiong′an New Area
浏览(3) 下载(0)
- DOI:
- 作者:
- 张志,葛东文,焦凯,李东昊,陈亚军,王海红
Zhang Zhi, Ge Dongwen, Jiao Kai, Li Donghao, Chen Yajun, Wang Haihong
- 作者单位:
- 中国石油华北油田分公司第一采油厂,河北任丘 062550
The First Exploit Factory of Huabei Oilfield Company, CNPC, Renqiu 062550, China
- 关键词:
- 雄安新区;油田退出;绿色退出;系统重构
Xiong'an New Area; oilfield withdrawal; green withdrawal; system reconstruction
- 摘要:
- 为探究国家战略驱动场景下,在役陆上油田如何实现生产设施有序退出与产能重构,以达成区域空间
腾退与国家能源安全保障的双重核心目标,以雄安新区华北油田全域退出工程为案例,系统梳理站场设备、油
气管道、配套系统及土壤治理的退出处置方案,构建油田设施退出与产能新建的协同机制分析框架。提出了
“分级递进、时序可控、空间有序”的站场退出技术体系,确立油气管道“强制拆除、强制注浆、弹性处置”
的分类决策标准,揭示了油田设施退出与产能系统新建在时间(拆建并行)、空间(功能替代)、资源(拆除利
旧)三维度的协同运行机制。雄安新区油田战略退出实践,探索出资源型央企响应国家重大战略的“破立并
举”路径,在服务新区千年大计的同时保障了能源安全,可为新时代国家重大战略实施中的产业绿色退出与生
产系统重构提供有益启示。
This paper aims to investigate how in-service onshore oilfields achieve orderly withdrawal of production facilities and reconstruction of production capacity under nationally strategic scenarios, and to realize the dual core objectives of regional space release and national energy security. Taking the whole-domain withdrawal project of Huabei Oilfield in Xiong'an New Area as a case, this paper systematically reviews the withdrawal and disposal schemes for station equipment, oil and gas pipelines, supporting systems, and contaminated soil remediation, and constructs an analytical framework for the coordination mechanism between oilfield facility withdrawal and new production capacity development. A station-withdrawal technical system characterized by “hierarchical progression, controllable phasing and orderly spatial arrangement” is proposed. Classification-based decision criteria for oil and gas pipelines are established, covering “mandatory demolition, mandatory grouting and flexible disposal”. Additionally, the three dimensional coordination mechanism between oilfield facility withdrawal and the new production capacity system is revealed, encompassing the temporal dimension (simultaneous demolition and construction), the spatial dimension (functional substitution), and the resource dimension (reuse of demolished assets). The strategic withdrawal practice of Huabei Oilfield in Xiong'an New Area has explored a pathway of “demolishing the old and building the new simultaneously” through which resource-based central state-owned enterprises respond to major national strategies. While serving the millennium-plan vision of the New Area, it safeguards energy security, thereby offering valuable insights for green industrial withdrawal and production system reconstruction in the implementation of major national strategies in the new era.
