EPC项目施工分包商目标成本管理与控制
Object Cost Management and Control of EPC Project Subcontractors
浏览(1790) 下载(2)
- DOI:
- 作者:
- 高兴, 连守民, 王茶
GAO Xing, LIAN Shou-ming, WANG Cha
- 作者单位:
- 中国石油天然气管道局第二工程分公司
China Petroleum Second Pipeline Construction Company,Xuzhou 221008,China
- 关键词:
- 目标成本;成本控制;EPC;管理
object cost;cost control;EPC;management
- 摘要:
- 文章在阐述工程项目目标成本管理与控制的一般方法的基础上,结合兰银管道工程实际,从人员、材料、设备、工期成本控制,采用新技术控制成本,分包成本控制等方面,论述了在保证工期和满足质量要求的情况下,把工程施工中所消耗的各种资源和费用控制在计划成本范围之内的方法,保证了成本目标的实现,创造了较好的经济效益。
This paper introduces common methods of object cost control for engineering projects. Then it discusses, in combination with the practice of Lan-Yin Pipeline Project, the methods of controlling resource consumption and costs in project construction within the plan cost range under the condition of guaranteeing construction period and quality, which include cost controls for personnel, material, equipment and construction period, cost control by adopting new technology and cost control for subcontracts.2009,S2(S2): 30-34 收稿日期:2009-8-1分类号:F275.3作者简介:高兴(1977-),男,江苏徐州人,助理工程师,2000 年毕业于河北廊坊中国石油管道学院,从事管道工程管理工作参考文献:
[1] 郭显光. 现代企业管理[M]. 北京:中国商业出版社,1999.
[2] 赵铁生. 工程项目管理[M]. 天津: 天津大学出版社,1992.
[3] 陆永炜. 企业成本控制学[M]. 上海: 上海社会科学院出版社,1992.