PMT+PMC+EPC模式下的EPC施工管理
EPC Construction Management under PMT + PMC + EPC Mode
浏览(1873) 下载(7)
- DOI:
- 作者:
- 张明瑾, 于永超
ZHANG Ming-jin, YU Yong-chao
- 作者单位:
- 中国石油天然气管道局
China Petroleum Pipeline Bureau,Langfang 065000,China
- 关键词:
- 输气管道;PMT;PMC;EPC;施工管理;措施
gas transmission pipeline;PMT;PMC;EPC;construction management;measure
- 摘要:
- 中石油股份公司在兰银输气管道工程中首次采用了PMT+PMC+EPC管理模式,做好EPC施工管理工作需根据工程实际并按新模式的要求采取措施。文章阐述了通过采取建立明确的项目责任体系、完善落实EPC程序文件、规范现场管理、召开专项会议解决技术难题、建立强有力的工程建设指挥协调系统、加强服务与培训工作、加强参建各方的沟通与协调等措施,做好EPC的施工管理工作。
Lan-Yin Gas Transmission Pipeline Project adopted the PMT + PMC + EPC mode for the first time in China pipeline construction. Implementation of EPC construction management needs making close relation with engineering practice and adopting measures according to the new mode requirements. In the EPC construction management of Lan-Yin Pipeline Project, the following work was well carried out: establishing definite project responsibility system, consummating EPC procedure files and putting them into practice, standardizing site management, holding special meeting to solve difficult technical problems, establishing powerful engineering construction commanding and coordinating system, enhancing service and training work, enhancing communication and coordination among construction partners.2009,S2(S2): 17-19 收稿日期:2009-8-1分类号:F273作者简介:张明瑾(1979-),男,吉林四平人,工程师,2003 年毕业于华北水利水电学院建筑工程专业,长期从事管道工程的施工管理工作参考文献:
[1] 刘家明,陈勇强,戚国胜. 项目管理承包:PMC 理论与实践[M].北京:人民邮电出版社, 2005.
[2] 王伍仁. EPC 工程总承包管理[M]. 北京:中国建筑工业出版社,2008.