利津污水站改造工艺设计
Process Modification Design of Lijing Sewage Station
浏览(1564) 下载(1)
- DOI:
- 作者:
- 呙如地
GUO Ru-di
- 作者单位:
- 胜利工程设计咨询有限责任公司, 山东东营 257026
Shengli Engineering Consulting Co.,Ltd.,Dongying 257026,China
- 关键词:
- 油田采出污水|污水处理工艺|工艺改造
oilfield produced sewage|sewage treatment process|process reformation
- 摘要:
- 文章阐述了通过在胜利油田利津污水站工艺流程中增设一次除油罐、双滤料过滤器、精细过滤器,改造混凝沉降罐,并采用分别供水等措施,解决了污水站处理的污水因来源发生变化,污水性质发生变化,从而不能达标处理的问题。
In the process modification of Lijin Sewage Station, by means of adding a primary oil removal tank, a filter with double filtering materials, a fine filter and reforming a coagutation sedimentation tank and adopting separative water supply, the sewage problems at Lijin Sewage Station caused by changed sewage source and changed sewage properties are solved. The sewage treatment quality reaches relevant standard.2009,s1(s1): 162-164 收稿日期:2009-3-6分类号:TE357.61作者简介:呙如地(1972-),男,安徽滁州人,工程师,1996年毕业于武汉水利电力大学,主要从事油田水处理工艺设计工作。