50000m3双盘式浮顶罐罐底焊接防变形措施及变形处理
Deformation prevention and Its Treatment for the Floor plates of 50000m3 Dual一deck Floating Roof Tank During Welding
浏览(1701) 下载(0)
- DOI:
- 作者:
- 库少英
Ku Shaoying
- 作者单位:
- 石油部第七工程公司
- 关键词:
- 摘要:
- 石油部第七工程公司在承担由日本引进的50000m3四台双盘式浮顶罐的施工中,为了保证施工质量,在罐底焊接中分析引起底板变形的原因后,提出不设置夹具大板焊接减小变形的措施,其具体作法是改变焊接顺序,采取反变形措施及减少板端留头。因此在控制焊接变形方面取得了一定的效果。
In order to ensure construction quality measures for reducing weld deformation of floor plate without clamps have been taken by the Seventh Engineering Cons-traction Co.of petroleum Industry Department on the basis of analysing the defor-matron reasons during constructing four 5.0000m3 dual-deck floating roof tanks intro-duced from Japan.The main measures to be tken a re: changing the welding seyuences, taking deformatian prevention mea nsand minimizing the allowance of plate ends By taking such measures reduction of weld deformation has been achieved1987,4(4): 13-17参考文献:
(1)《焊接结构))机械工业出版社 第1版1979
(2)《实用焊接手册李水利电力出版社 第1版1985
(3) 《钢构造溶接工作法通论》日本溶接协会监修第20版1985·