大型设备基础设计施工中的几个技术问题
Some Technical Problems on Foundation of Large Equipments in Desig-ning and Construction
浏览(1769) 下载(3)
- DOI:
- 作者:
- 徐至钧
Xu Zhijun
- 作者单位:
- 长岭炼油厂
- 关键词:
- 摘要:
- 本文结合工程实践,对大型石油化工设备基础在设计与施工中常遇到的几个技术问题提出了-些看法。在设计构造细则中主要谈了:地脚螺栓的埋置深度、露出高度及基础某些部位的配筋问题。在施工要点中主要谈了:地脚螺栓的定位、基础混凝土浇筑时的几个关键部位及施工质量要求,另外还着重谈了施工事故的处理。本文可供塔、炉、罐以及其它大型动力设备基础的设计施工人员参考。
Combined the engineering practices,the author makes some suggestions on some technical problems of large petro-cnemical equipments foundation in designing and constuctian The embeded depth,exposed height of .archor bolts and the reinforcement of some parts of founda-tion are give in the detai rules of design structure.The locating of archol of foundation are introduced in construction instrcction.In addition the construction defects are also suggested.This article can be used for references to the persons who engage in desiging and construction for tower,future,tankand other large power equipment.1988,2(2): 13-19 收稿日期:1987-2-14参考文献:
[1]徐至钧:《高塔基础设计与计算》,烃加工出版社,1986年
[2]徐至钧:塔基础的加固设计,《石油建筑设计》. 1983年,第1期
[3]徐至钧:塔型设备基础倾斜与地基变形观测.《建筑结构》,1978年.第6期
[4]徐至钧:模糊数学在研究大型储罐地基变形中的应用,《工业建筑》,1986年,第12期