缆风绳及地锚失效问题的研究
Research on Failure of Mooring Rope and Ground Anchor
浏览(1713) 下载(1)
- DOI:
- 作者:
- 林汉丁
Lin Handin
- 作者单位:
- 福建省工业设备安装公司
- 关键词:
- 缆风绳;失效;初拉力;预拉紧力;地锚
- 摘要:
- 本文从分析计算缆风绳拉力的查浦林公式入手,论证了合理确定初拉力,防止在多缆风绳受力系统中缆风绳弧垂变化导致缆风绳及地锚失效的可行性;采用将地锚按工作拉力预拉紧后再恢复至初拉力等方法,防止地锚位移导致缆风绳及地锚失效。
By analysing the Chaplin's formula for calculation of pull force of mooring rope, this paper proves the applicablity of reasonable determining its prepull force to prevent variance of rope arc weight in multi一mooring rope system from causing failure of mooring rope and ground anchor.Using the method, that is, pretensing ground anchor according its work pull force then releasing it until its pre一tension pull, can provent moving of ground anchor from causing failure of mooring rope and ground anchor.1990,3(3): 10-13参考文献:
1 林汉丁.安装,1990(1): 16~19.
2 林汉丁.石油1.程建设,1989.Vo1.15(5): 29~35.
3 杨文柱.重塑设备吊装r艺与计算.北京:中囚建筑工业出版社,1984: 217
4 陆培炎、徐振华.地荃强度与变形的计算.青海:青海人民出版社,1978: 60~80