大港油田2.3km海堤的施工
The Constrution of a 2.3km Sea Embankment in Dagang Oil Field
浏览(1812) 下载(2)
- DOI:
- 作者:
- 齐尚军, 王光辉, 冯维亚, 果会成
Qi Shangjun, Wang Guanghui, Feng Weiya, Guo Huicheng
- 作者单位:
- 大港油田勘察设计研究院 300280 天津市大港区
- 关键词:
- 浅海;海堤;施工;渤海
- 摘要:
- 渤海沿岸油田开发已转向滩海地区,海堤是滩海油田勘探开发的重要基础手段。1992年大港油田开发张东油田时,用直接推进法成功地修建了长2.3km的突堤,本文对该海堤工程两个阶段的施工经验予以总结,供滩海海堤建设参考。
As the development of oil fields along the coastal area of Bohai Sea has been shifted to theseabeach, the construction of sea embarkments becomes a basically important means. In 1992, asea wall of 2.3km in length was built in Dagang Oil Field by taking the "direct pushing method".Summarizing the experiences gained in constructing this eWbankment, this paper offers refrencesfor constructing sea walls in the future.1994,6(6): 13-15 收稿日期:1994-6-27分类号:U656.2
