无锚点吊推用门架设备的应力测试
Stress test for non-anchoring point gantry hoisting equipment
浏览(1645) 下载(1)
- DOI:
- 作者:
- 胡玉林, 仝兴华, 张志田
Hu Yulin , Tong Xinghua & Zhang Zhitian
- 作者单位:
- 石油大学 257062 山东省东营市
Dongying, Shandong
- 关键词:
- 吊装设备;应力分析;结构分析
Hoisting equipment;Stress analysis;Structural analysis
- 摘要:
- 通过对无锚点吊推法采用的大型门架设备进行静态应力测试以及实际吊装过程中的现场跟踪测试,结合对门架设备的结构分析,改善了吊推方案,保证了高116m、164t的大型火炬塔架的顺利吊装成功,为同类吊装工程提供了参考数据。
The hoisting program is modified after. static stress test of large gantry equipment used innon-anchoring point hoisting,in-situ tracking test in the process of pratical hoisting,and struc-tural analysis of gantry equipment. It ensures sucessful hoisting of large torch towers with 116mheight and 164t weight,and provides reference data for the same kind of hoisting engineering.1997,1(1): 30-33 收稿日期:1996-9-9参考文献:
1 A.格哈利等编.胡人礼译.结构分析.人民铁道出版社,1978
2 佟景伟、伍供泽等编.实验应力分析.湖南科学技术出版社,1983