加氢裂化装置高压管道的施工与管理(待续)
Construction and Management of High Pressure Pipeline of Hydro-cracking Unit (to be continued)
浏览(1737) 下载(1)
- DOI:
- 作者:
- 冀林柱
JI Lin-zhu
- 作者单位:
- 中石化第四建设公司, 天津市大港区 300270
- 关键词:
- 裂化;设备;高压;管道;施工;焊接;工艺参数;管理
Cracking;Equipment;High pressure;Pipe line;Construction;Welding;Process parameter;Management
- 摘要:
- 本文以100万t/t加氢裂化装置的高压管道施工为例,对高压管道的预制、安装、焊接、检验、试压和吹扫的施工工艺、执行标准、工艺参数和技术要求等进行了系统性的介绍,同时对高压管道施工全过程的管理方法和经验予以归纳论述,供石化建设工程中高压管道施工安装借鉴。
Per an example of construction of high pressure pipeline in 1 million t/a hydro-cracking unit this paper introduces systematically construction process, executive specifications, process parameter and technical requirement of high pressure pipeline including pre-fabrication of pipe, installation, weld- ing, checking, testing, blowing and clearing. Meanwhile it discusses management and experience of the whole procedure of the construction as an example for other high pressure pipeline construction contractors of petro-chemical projects.1998,2(2): 14-18,2