262t/120m烟囱的分段吊装
Sectional Lifting & Installation for a 262t/120m Chimney
浏览(1800) 下载(5)
- DOI:
- 作者:
- 郑立贵, 李景乐
Zheng Ligui, Li Jingle
- 作者单位:
- 中国石油天然气第一建设公司
Luoyang,Henan
- 关键词:
- 大型;钢结构;安装;技术
spherical tank;integral transportation;mount ing;method
- 摘要:
- 高耸钢结构的吊装, 一般多采用扳转法和双桅杆抬吊法等整体吊装方法, 本文介绍采用250t履带吊车分段吊装烟囱的一些关键技术, 包括烟囱塔架吊装索具、塔架吊耳和偏心吊装索具的设置以及烟囱筒体吊装卡具的制作。该方法与扳转法、双桅杆抬吊法相比, 节约了施工辅助用料, 降低了费用, 减小了作业空间, 提高了预制精度
Generally, high steel structure was lifted with turning & dual mast lifting method .But the paper introduced some critical techniques of sectional chimney lifting with 250t caterpillar crane,including the setting of chimney frame lift ing rig, frame tug & of fcenter lift ing rig and the making of chimney shell lifting clamps .As compared with turning & dual mast lif ting method, this method can save many auxiliary materials,lower the cost, reduce the operating space & increase prefabricat ing accuracy .2001,27(27): 45-47 收稿日期:2000-10-16分类号:TE682作者简介:郑立贵, 1995 年毕业于江汉石油学院机械设计与制造专业, 现任中国石油天然气第一建设公司第四工程分公司起重队副队长, 工程师。通讯地址:河南省洛阳市, 邮编:471023