西气东输二线工程集中坡口施工降低成本的措施
Reducing Costs by Taking Centralized Pipe Beveling Measure in Second West to East Gas Pipeline Project
浏览(1797) 下载(1)
- DOI:
- 作者:
- 薄振刚, 刘新生, 葛成吉
BO Zhen-gang, LIU Xin-sheng, GE Cheng-ji
- 作者单位:
- 中国石油天然气管道局第四工程分公司
Fourth Engineering Company of China Petroleum Pipeline Bureau, Langfang 065000, China
- 关键词:
- 管道施工;焊接;集中坡口;施工成本
pipeline construction;welding;centralized beveling;construction cost
- 摘要:
- 西气东输二线管道首次采用了X80钢管,对钢管的焊接质量要求极为严格。钢管坡口是管道焊接前的一道重要工序,坡口型式的好坏直接影响着焊接质量和将来管道的运行安全。由于厂家提供的钢管全部为V型坡口,根据西二线焊接工艺规程的要求,半自动焊接应采用双V坡口,为此需要对主线路焊接的钢管重新加工坡口。为降低成本,方便施工,通过在堆管场集中坡口,实现了人员、设备利用率最大化,避免现场发生二次布管工序。
X80 steel pipes are used in Second West to East Gas Pipeline for the first time, which need extraordinary welding quality. Pipe beveling is an important procedure prior to welding and its quality affects directly the welding quality and future pipeline operation safety. Semi -automatic welding needs double V bevels in accordance with the welding process regulation for Second West to East Gas Pipeline, so that the single V beveled pipes provided by pipe manufacturer are required to reform. In order to reduce the costs and be convenient to processing, the pipe beveling is carried out at a piled pipe zone for maximum utilization of manpower and equipment, thus to avoid secondary field pipe allocation.2010,S1(S1): 249-250 收稿日期:2010-10-18分类号:TE972.5作者简介:薄振刚(1979-),男,河北廊坊人,工程师,先后从事过管道工程线路施工、顶管和预投产等工作