大口径对接顶管作业的测量技术
Measurement Technique of Large Diameter Pipes Pushed from Both Sides till Butt Jointed
浏览(1753) 下载(1)
- DOI:
- 作者:
- 张振华, 曹新胜, 刘新生
ZHANG Zhen-hua, CAO Xin-sheng, LIU Xin-sheng
- 作者单位:
- 中国石油天然气管道局第四工程分公司
Fourth Engineering Company of China Petroleum Pipeline Bureau, Langfang 065000, China
- 关键词:
- 管道;顶管;测量;对顶
pipeline;pipe pushing;measurement;pushing from both sides
- 摘要:
- 在我国油气管道建设施工中,采用顶管作业穿越较长距离的公路、铁路时,由于地质条件复杂,容易发生管路抱死现象,解决的方法是采用对接顶管,即:从另外一侧重新制作操作坑(竖井),安装设备及导轨,经过严密的测量后,进行对顶,直到两侧管路完全衔接为止。通过西气东输二线西段工程第11标段连霍高速及G312国道穿越工程,阐述了对接顶管的测量方法。
As oil and gas pipelines crossing longer distance highways and railways under complex geological conditions, pipeline stuck phenomena often happen in pipe pushing operations. The method of pipes pushed from both sides till butt jointed is used to solve such problem, that is to make an another operation pit (vertical shaft) for installing equipment and guide tracks, than conduct strict measurement and pipe pushing operation from both sides till two pipelines jointed together. This technique is used in Liang-Huo expressway crossing and G312 national highway crossing at the 11th bidding section of West Section Project of West to East Gas Pipeline. And this paper puts emphasis on the measurement methods applied in these crossing projects.2010,S1(S1): 241-243 收稿日期:2010-10-18分类号:TE973.4作者简介:张振华(1982-),男,河北廊坊人,助理工程师,2005年毕业于河北理工大学测绘工程专业,先后从事管道工程的施工、测量、物资管理、竣工资料编制工作参考文献: