大口径顶管施工作业管路抱死的解决方法
Pipe Stuck Resolving Method in Large Diameter Pipe Pushing Construction
浏览(1584) 下载(1)
- DOI:
- 作者:
- 宋博, 隋鲁宁, 贾志强
SONG Bo, SUI Lu-ning, JIA Zhi-qiang
- 作者单位:
- 中国石油天然气管道局第四工程分公司
Fourth Engineering Company of China Petroleum Pipeline Bureau, Langfang 065000, China
- 关键词:
- 顶管施工;特殊地质;测量纠偏
manual pipe pushing;pipe stuck;pushing from both sides;measurement deviation rectifying
- 摘要:
- 在油气管道穿越工程中,特殊地质条件下大口径顶管施工作业容易发生管路抱死现象。为解决这一问题,采用了对接顶管施工技术。结合西气东输二线施工案例,对施工过程中的测量及纠偏技术进行了探索和研究,为今后在无水砂卵石等特殊地层条件下的顶管施工提供了有效的方法和依据。
In oil and gas pipeline crossing construction under particular geological conditions, large diameter pipeline stuck phenomena often happen in pipe pushing operation. In order to solve such problems, the technique of pipes pushed from both sides till butt jointed is adopted. Associated with the cases in Second West to East Gas Pipeline Project,the research on measurement and deviation rectifying during pipe pushing is conducted. The research results also offer an effective base for other pipe pushing construction under particular geological conditions such as dry pebble sand stratum.2010,S1(S1): 239-240 收稿日期:2010-10-18分类号:TE973.4作者简介:宋博(1986-),男,陕西铜川人,技术员,主要从事管道工程的施工、试压干燥、顶管、竣工资料编制工作参考文献:
[1] 中国地质大学. 顶管施工技术及验收规范[M] . 北京: 人民交通出版社,2010