西气东输二线西段的EPC项目调度信息管理
EPC Project Dispatching Information Management of West Section of Second West to East Gas Pipeline Project
浏览(1657) 下载(1)
- DOI:
- 作者:
- 李杨, 李凯
LI Yang, LI Kai
- 作者单位:
- 中国石油天然气管道局国内事业部
China Petroleum Pipeline Bureau, Langfang 065000, China
- 关键词:
- EPC项目;信息管理;调度体系
EPC project;information management;dispatching system
- 摘要:
- 在西气东输二线西段工程的EPC实施阶段,采用了"业主+监理+EPC"管理模式,具有工程量大、战线长、牵涉的专业多、协调任务重等特点,致使信息收集难度大、协调解决问题任务重,因此建立了一套系统、高效的调度信息管理体系,对整个工程的正常运转起到了决定性作用。
In the implementation of West Section of Second West to East Gas Pipeline Project, the management mode of "owner + supervisor + EPC" is applied, which has the features of large engineering quantities, long construction line, multi-profession and heavy coordination work. So a set of systematic and highly efficient dispatching information management system is established and it plays a critical role in normal operation of the whole project.2010,S1(S1): 189-194 收稿日期:2010-11-18分类号:F406.2作者简介:李杨(1983-),女,河北廊坊人,2006年参加工作,从事天然气管道输送技术工作参考文献:
[1] 梁世连.工程项目管理[M].北京: 中国建材工业出版社,2004.
[2] 危道军. 建筑工程施工组织[M].北京: 中国建筑工业出版社,2004.
[3] 丁士昭. 建筑工程项目管理[M].北京: 中国建筑工业出版社,2004