如何推进管道施工阶段全面质量管理体系的运行
How to Promote Running of Comprehensive Quality Management System in Pipeline Construction Phase
浏览(1842) 下载(4)
- DOI:
- 作者:
- 曹艳兵, 金宏
CAO Yan-bing, JING Hong
- 作者单位:
- 中国石油天然气管道局第一工程分公司
First Engineering Company of China Petroleum Pipeline Bureau, Langfang 065000, China
- 关键词:
- 西气东输;管道建设;施工阶段;质量管理体系
west to east gas transmission;pipeline construction;construction phase;quality management system
- 摘要:
- 管道一公司西气东输二线西段项目部在工程施工过程中采取了全面质量管理模式。全面质量管理的基本方法可以概括为:一个过程,四个阶段,八个步骤,七种方法。管道一公司西气东输二线项目部通过对人、机、料、法、环等五大方面的全面质量管理,达到了对西气东输二线工程质量控制的目标,为今后大管径长输管道施工质量管理积累了成熟的经验。
The basic method of comprehensive quality management could be summarized as "one procedure,four stages, eight steps and seven measures". The Second West to East Gas Pipeline Project Department of CCP First Engineering Co. promotes the comprehensive quality management in aspects of personnel, machinery,materials, law and environment and reaches the target. Its mature experience is helpful to construction quality management of future long-distance pipelines with large diameter.2010,S1(S1): 158-162 收稿日期:2010-11-18分类号:F406.3作者简介:曹艳兵(1978-),男,河北廊坊人,工程师,1999年毕业于廊坊石油管道学校,先后从事过管道工程的技术、质量、安全管理工作参考文献:
[1] 张检身.工程质量管理指南[M].北京:中国计划出版社,2001