砂土地区降水施工新技术
New Construction Method of Lowering Ground Water Level in Sandy Soil Areas
浏览(1701) 下载(2)
- DOI:
- 作者:
- 潘江芹, 郝国卫
PAN Jiang-qin, Hao Weiguo
- 作者单位:
- 中原石油勘探局建筑安装工程公司, 河南濮阳 457001
Architechture Installation Company, Zhongyun Petroleum Exploration Bureau, Puyang 457001, China
- 关键词:
- 砂土地区;降低水位;施工技术
sandy soil area;lowering water;table construction;technology
- 摘要:
- 在水位较高的砂土地区进行站场施工,必须先将地下水位降到设计挖深以下,才能保证工程的顺利进行。文章从施工设备及材料的准备、施工步骤、施工注意事项等方面介绍了一种适用于砂土地区降水的新方法。该方法降水效果好,投入少,操作简单,易掌握。
In construction of field stations located in sandy soil areas with higher ground water levels, the ground water level must be lowered below designated excavated depth so as to guarantee the smooth engineering progress. This paper introduces a new construction method of lowering ground water level suitable for sandy soil area regarding preparation of construction equipment and materials, construction procedure, attentive matters for construction and so on. This method has the advantages of efficient water level lowering, low cost and easy operation.2007,2(2): 72-73 收稿日期:2006-6-13分类号:TU441作者简介:潘江芹 (1974- ),男,湖南桃源人,1996 年毕业于西安石油学院 (现西安石油大学),现为中原石油勘探局建筑安装工程公司安装工程师。
