自升式钻井平台新型拔桩挖泥器的研制
Research and Development of New Dredger for Pile-pulling Used in Jack-up Drilling Platform
浏览(2273) 下载(1)
- DOI:
- 作者:
- 刘允杭, 杨旬
LIU Yun-hang, YANG Xun
- 作者单位:
- 中国石油集团海洋工程有限公司钻井事业部 天津 300280
Drilling Business Department of China National Petroleum Offshore Engineering Co., Ltd.,
- 关键词:
- 自升式钻井平台;拔桩;挖泥器;研制
jack-up drilling platform;pile-pulling;dredger;research and development
- 摘要:
- 自升式钻井平台插桩入泥过深时,导致拔桩阻力增大,拔桩困难。文章介绍了一款针对该实际情况而研制的辅助拔桩挖泥器,用于拔桩之前挖出桩靴上部土体,通过减轻上部土重,达到了顺利拔桩的目的。文章分别从挖泥器方案设计、工作原理、现场试验等对其进行了论述。现场试验表明,该装置能够明显减小拔桩阻力,达到提高拔桩效率和进一步保证平台结构安全的目的。
In the case of deep pile-insertion, pile-pulling operation is difficult due to large soil resistance. A new kind of dredger for aiding pile-pulling operation has researched and developed to dig up the soil over the pile shoe so as to decrease the soil loads on the pile shoe. The design scheme and working principle of the new dredger are discussed. Its field test shows that this dredger can remarkably decrease pile-pulling resistance and reach the target of boosting pile-pulling efficiency and further ensuring platform safety.2013,6(6): 38-41 收稿日期:2013-3-9DOI:10.3969/j.issn.l001-2206.2013.06.010作者简介:刘允杭(1964-),男,山东滕州人,高级工程师,1989年毕业于中国石油大学(华东),现从事海洋石油工程管理工作。参考文献:
[1]李海,石民惠.滞留海上一午之久的胜利六号钻井平台解脱移位[J].中国海洋平台,1992,(5):228.
[2]张爱霞,段梦兰,胡知辉.海床土体固结效应对平台拔桩吸附力的影响[J].石油机械,2012,40(4):54-57.
[3]陈建强,王建会,李明海,等.自升式钻井平台拔桩机理探析[J]海岸工程2012,31(2):1-6.