大庆油田新一联变电所的微机自动化改造
Computer Automatization Alteration of Xinyiliang Transformer Substation in Daqing Oilfield
浏览(2170) 下载(1)
- DOI:
- 作者:
- 李国权
LI Guo-quan
- 作者单位:
- 大庆油田工程建设有限公司安装公司 黑龙江大庆 163411
Installation Company of Daqing Oilfield Engineering Construction Co., Daqing 163411, China
- 关键词:
- 变电所;断路器;直流电源;继电器;改线措施
transformer substation;35 kV SF6 circuit breaker;DC power supply;relay;line realignment measure
- 摘要:
- 在大庆油田新一联35/10 kV变电所的微机自动化改造工程中,为节省投资,只更换控保屏,而其他设备则利旧处理使用。要把新建微机综合自动化保护装置接入老式设备保护回路中,存在着辅助结点数量不够、回路配置不合理、回路误动作等问题。针对施工中遇到的这些问题进行分析,并制订了具体改线措施,顺利地完成了改造任务。
In construction process of computer automatization alteration project of Xinyiliang 35/10 kV transformer substation of Daqing Oilfield,only the control and protection unit is replaced but other devices are reutilized with some treatments in order to save investment.there are problems in connecting the new computer integrated automation device into the protection circuit of old equipment,such as inadequate number of assistant nodes,unreasonable loop configuration and wrong loop action.Such typical problems appearing in the construction are analyzed and specific measure of line realignment is put forward,thus the alteration task is successfully completed.2013,4(4): 52-55 收稿日期:2012-5-8DOI:10.3969/j.issn.1001-2206.2013.04.016作者简介:李国权(1973-),男,黑龙江青冈人,工程师,1993年毕业于大庆石油学校电力网专业,现从事油田工程电气安装工作。