伊朗雅达EPC项目工程变更风险的管理
Optimization of Station Construction Management Model of Second West to East Gas Pipeline Project
浏览(2457) 下载(2)
- DOI:
- 作者:
- 刘明煜
LIU Ming-yu
- 作者单位:
- 胜利油田胜利勘察设计研究院有限公司 山东东营 257026
Shengli Oilfield Shengli Engineering & Consulting Co., Ltd., Dongying 257026, China
- 关键词:
- EPC项目;工程变更;风险管理;风险识别;风险评估;应对策略;应对措施
Second West to East Gas Pipeline;station construction management mode;optimization
- 摘要:
- EPC总承包模式是一种风险与利润并存的总承包模式,在EPC项目管理中,导致工程变更的不确定性因素非常多。通过风险识别,确定了伊朗雅达项目的工程变更风险因素主要有七类,而后按综合风险、风险管理侧重点对工程风险进行评估,提出应对策略、措施,保证了项目目标的实现。
EPC mode is used in the construction management for the Second West to East Gas Pipeline Project as a whole,but the bidding route section subcontract mode is adopted for the station and valve chamber construction management.Combined with the engineering practice,this paper briefly introduces the current status and existing problems in the station construction management mode,then analyzes and summarizes the establishment and implementation experience of the station construction management mode as well as the approaches to boosting the management level.It provides a reference for follow-up construction of oil and gas pipelines.2013,3(3): 41-45 收稿日期:2012-10-12DOI:10.3969/j.issn.1001-2206.2013.03.011作者简介:刘明煌(1979-),男,河南郑州人,工程师2003年毕业于中国石油大学.主要从事工程造价工作。参考文献:
[1] 郭中生,聂昌谋,周作坤.伊朗Buv-hack合同及其合同管[J].石油化工建设,2012,(2):21-24.
[2] 魏亦.EPC总承包项日风险管理探析[J].中州煤炭,2012,(5):110-112.
[3] 葛志江.国际石油工程EPC总承包项日安全风险因素分析[J].石油化工建设,2009,(4):36-39.
[4] 张玉民.国际石油建设工程的风险评估[[J].中国高新技术企业,2008,(22):189-190.
[5] 苑志成,周雷,卢金芳.国际石油工程项日风险评价力法及应用研究[J].油气田地而工程,2003,(3):1-3.
[6] 张再良,周旭荣,郭胜军,等.国际EPC项日的风险识别与风险防范策略[J].石油工程建设,2010,36(5):75-78.