压缩机大体积混凝土基础施工技术
Construction of Compressor Bulk Concrete Base
浏览(2148) 下载(6)
- DOI:
- 作者:
- 马跃星
MA Yao-xin
- 作者单位:
- 辽河油田油田建设工程一公司, 辽宁 盘锦 124010
Liaohe Oilfield Engineering Construction Co., Panjin 124010, China
- 关键词:
- 大体积混凝土;基础;配合比;水化热;降温;养护
bulk concrete;base;proportioning ratio;hydration heat;temperature decrease;curing
- 摘要:
- 压缩机大体积混凝土基础的施工质量对压气站的安全运行具有重要意义,通过对混凝土原材料和配合比的选用,混凝土入模温度、混凝土温升速度和温差的控制等方面的试验研究以及采取相应施工措施,使压缩机大体积混凝土基础施工过程中的内外温差控制在25℃以内,避免了裂缝的产生,保证了大体积混凝土基础的施工质量。
The construction quality of a compressor bulk concrete base is significant to safe compressor station running. Through the experimental study and by taking relevant measurements on selecting materials and proportioning ratio, controlling concrete placement temperature, temperature increasing rate and temperature difference, the temperature difference between the inside and outside of the base is controlled within 25 ℃ and cracks in the base do not occur. The construction quality of the bulk concrete base is guaranteed.2013,1(1): 36-38 收稿日期:2012-2-17DOI:10.3969/j.issn.1001-2206.2013.01.011作者简介:马跃星(1979-),男,辽宁盘锦人,工程师,2003年毕业于辽宁石油化工大学,主要从事油气田地面建设技术管理工作。参考文献:
[1] GB 50496-2009,大体积混凝土施工规范[S].
[2] GB 50204-2010,混凝土结构工程施工质量验收规范[S].
[3] 龙永新. 焦碳塔基础混凝土裂缝控制技术[J]. 石油工程建设,2010,(2):72-74。