运用QC方法降低盾构施工的地表沉降
Using QC Method to Decrease Ground Surface Settlement in Shielding Construction
浏览(2396) 下载(1)
- DOI:
- 作者:
- 赵雪峰, 刘广仁, 常喜平
ZHAO Xue-feng, LIU Guang-ren, CHANG Xi-ping
- 作者单位:
- 中国石油天然气管道局第四工程公司, 河北廊坊 065000
China Petroleum Pipeline No.4 Construction Co., Langfang 065000, China
- 关键词:
- 盾构;QC方法;质量控制
shielding construction;QC method;quality control
- 摘要:
- 介绍了如何应用QC方法降低西气东输二线长江盾构工程中盾构施工的地表沉降问题, 通过现场调查, 制作了因果分析图和要因确认表, 从中得出盾构施工地表沉降的要因, 同时采取针对性改进措施, 收到了良好的效果。
It is introduced how to use QC method to decrease ground surface settlement in the shielding construction of the Second West to East Gas Pipeline.Through field investigation, the analytical figure of cause and effect and the essential factor determination list are made.With the help of them, the essential factors affecting ground surface settlement in shielding construction are determined, then the pertinent improvement measures are taken and good results are obtained.2012,04(04): 44-47 收稿日期:2011-5-23分类号:U455.43作者简介:赵雪峰(1982-),男,黑龙江依安人,2008年毕业于大连理工大学结构工程专业,硕士,现从事盾构穿越技术管理工作.参考文献:
[1] 中国质量管理协会.QC小组基础教材[M].北京:中国社会科学出版社,2008.
[2] 中国质量协会.质量管理小组基础知识[M].北京:中国计量出版社,2011.
[3] 戴良军,张晓震.运用QC小组活动提升发电厂房主机间排架柱混凝土施工外观质量[J].水利科技与经济,2010,(6):689-691.
[4] 胡登辉,耿云鹏.盾构机以D模式推进工艺穿越安庆长江大堤[J].石油工程建设,2010,(1):25-28.