珠三角地区河流定向钻穿越设计施工问题探讨
Discussion on Design and Construction Problems in Directional Drilling Crossing Construction in Pearl River Delta Region
浏览(2149) 下载(2)
- DOI:
- 作者:
- 徐向阳, 许明武, 杨菲
XU Xiang-yang, XU Ming-wu, YANG Fei
- 作者单位:
- 中海石油炼化东莞油品储运有限公司, 广东东莞 523988
CNOOC Dongguan Oil Storage and Transportation Co., Ltd., Dongguan 523988, China
- 关键词:
- 定向钻;河流穿越;珠江三角洲
directional drilling;crossing river;Pearl River Delta
- 摘要:
- 由于珠江三角洲特殊的地理环境以及复杂的工程地质情况, 定向钻穿越施工时遇到不少难题, 如钻头在粉细砂层中的抬头问题、在淤泥质土层中的导向问题等。针对长输管道现场定向钻施工中遇到的问题, 进行了分析研究, 提出了缩小探孔间距、调整穿越曲线、采用两级导向孔等有效应对措施, 为今后珠三角地区定向钻穿越设计和施工提供范例。
Due to peculiar geography and complex geological conditions in the Pearl River Delta, directional drilling crossing construction meets many problems, such as the driller head rising in silty-fine sand layer and the orientation deviation in sludge-soil layer.The problems encountered in the long distance pipeline directional drilling are analyzed, some effective measures are put forward, such as narrowing survey hole spacing, adjusting crossing curves and drilling two level pilot holes, which provide examples for future directional drilling crossing design and construction in the Pearl River Delta region.2012,04(04): 34-35 收稿日期:2011-6-21分类号:TE973.4作者简介:徐向阳(1978-),男,河南许昌人,工程师,1999年毕业于中国石油大学(华东)油气储运专业,2006年毕业于中山大学管理学院项目管理专业,硕士,现主要从事石油天然气储运工程管理工作.参考文献: