长输管道项目施工HSE管理之准备期工作探讨
Discussion about Preparation Phase Work for HSE Management of Long-distance Pipeline Project Construction
浏览(2686) 下载(2)
- DOI:
- 作者:
- 李建国
LI Jian-guo
- 作者单位:
- 中国石油天然气管道局第四工程分公司, 河北 廊坊 065000
No. 4 Engineering Company of China Petroleum Pipeline Bureau, Langfang 065000, China
- 关键词:
- 长输管道;HSE管理;项目前期
long-distance pipeline;HSE management;prophase of project
- 摘要:
- 长输管道施工项目的特点是施工作业环境恶劣,各种HSE风险高。文章重点介绍项目前期准备阶段的HSE管理、策划工作,包括中标后赴现场前的后方准备工作、赴现场后的前方准备工作等,指出要按策划—实施—检查—改进(PDCA)的运行模式,做好项目准备期各项HSE管理工作。
Characteristics of the long-distance pipeline construction project are bad construction environment and various high HSE risks. This paper introduces the HSE management and planning at preparation phase, which include the backside preparation work before entering worksite and the front preparation work after entering worksite following winning a bid. It points out that various HSE management work at preparation phase should be completed in accordance with the operation mode of plan—do—check—act (PDCA).2012,3(3): 75-76 收稿日期:2011-7-12DOI:10.3969/j.issn.1001-2206.2012.03.023作者简介:李建国(1973- ),男,河北定兴人,助理工程师,2010年毕业于于河北工业大学工程管理专业,现主要从事工程环保安全管理工作.