压缩机安装及环氧砂浆施工质量控制
Quality Control of Compressor Installation and Epoxy Mortar Construction
浏览(2274) 下载(8)
- DOI:
- 作者:
- 白成勇, 李海鹏
BAI Cheng-yong, LI Hai-peng
- 作者单位:
- 长庆油田分公司建设工程处, 陕西 西安 710086
Construction Engineering Department of PetroChina Changqing Oilfield Company, Xi' an 710086, China
- 关键词:
- 压缩机安装;垫铁;找正;二次灌浆;养护
compressor installation;iron shim;levering;secondary grouting;curing
- 摘要:
- 针对压缩机体积庞大、安装时找正要求严格的特点,介绍了压缩机安装时垫铁调平找正的方法,阐述了环氧砂浆的配制、养护以及二次灌浆的施工方法和注意事项。
A levering method with iron shims applied in the compressor installation is described to meet the strict leveling requirement of the bulk compressor installation.The compounding and curing of epoxy mortar and the construction method as well as matters for attention in the secondary grouting are illustrated.2012,2(2): 39-40 收稿日期:2011-1-11DOI:10.3969/j.issn.1001-2206.2012.02.011作者简介:白成勇(1964- ),男,甘肃镇原人,工程师,毕业于西安石油学院,现从事油气田地面工程技术管理工作.参考文献:
[1] 石国斌.钢筋混凝土剪力墙施工裂缝的分析与控制[J].建筑施工,2010,(4):87.
[2] 张冠伦.混凝土外加剂原理及应用[M].北京:中国建筑工业出版社,1996.
[3] 吴科如.建筑材料(第二版)[M].上海:同济大学出版社,1998.
[4] 葛新东,古桢.大型压缩机混凝土基础浇筑施工技术[J].石油工程建设,2007,(4):33-35.