基于层次分析法的备品备件库存管理分类模型及应用
Classification Model for Inventory Management of Spare Parts Based on Analytic Hierarchy Process and Its Application
浏览(2258) 下载(5)
- DOI:
- 作者:
- 郗祥远1, 高敬江2, 王福德2, 钟桂香3
XI Xiang-yuan1, GAO Jing-jiang2, WANG Fu-de2
- 作者单位:
- 1. 中油朗威工程项目管理公司, 河北 廊坊 065000;
2. 中亚天然气管道有限公司, 北京 100007;
3. 中国石油天然气管道工程公司, 河北 廊坊 065000
China Petroleum Long Way Engineering Project Management Co., Ltd., Langfang 065000, China
- 关键词:
- 备品备件;库存管理;层次分析法(AHP)
spare parts;inventory management;analytic hierarchy process (AHP)
- 摘要:
- 文章基于Thomas L Saaty的层次分析法(AHP),将其应用到备品备件的分类中,树立备件缺货的安全风险、备件缺货对输量的影响、年度使用量、备件提前期和可替换性等五个关键准则,每一个关键准则又识别出四个选择,从而建立三级分类模型,将备件分为A(很重要)、B(重要)、C(较重要)三类。先比较每个准则的四个选择,再比较五个准则,得到的相对权重相乘作为复合权重。判断备件类别时只需要将相关的复合权重值相加,就可以根据预先定义好的分类标准给备件分类。应用时要注意结合已有经验来修正有关数据。
This paper presents a classification model for inventory management of spare parts based on Thomas L Saaty’s Analytic Hierarchy Process (AHP). A three level hierarchy has been structured. Five key criteria, including safety hazard of shortage, transportation influence of shortage, annual usage rate, lead time and possibility of substitution, and four alternatives for each criterion have been identified to classify spare parts as A(very important), B(important) and C(weak important). Composite weights for each criterion-alternative combination can be calculated by multiplying each normalized principle eigenvector coming from alternative comparison by the relative weight of the specific criterion. An absolute measure of a spare part criticality can be calculated by adding separate composite weights for all its criterion-alternatives and classification classes can be established by the measure. The classification model can be improved by experience in practical applications.2012,1(1): 77-80 收稿日期:2011-1-19DOI:10.3969/j.issn.1001-2206.2012.01.024作者简介:郗祥远(1978- ),男,河北廊坊人,工程师,2005年毕业于西安石油大学,现从事工程监理及项目管理工作.参考文献:
[1] Thomas L Saaty.The Analytic Hierarchy Process:Planning,Priority Setting,Resource Allocation[M].New York:McGraw-Hill,1980.
[2] Thomas L Saaty,Luis G Vargas.The Logic of Priorities:Applications in Business,Energy,Health,and Transportation[M].Boston:KluwerNijhoff,1982.
[3] Thomas L Saaty.Decision Making for Leaders:The Analytical Hierarchy Process for Decisions in a Complex World[M].Belmont:Wadsworth,1982.
[4] Thomas L Saaty,Luis G Vargas.Decision Making in Economic,Social and Technological Environments[M].Pittsburgh:RWS,1994.
[5] Ernest H Forman,Saul I Gass.The analytical hierarchy process-an exposition[J].Operations Research,2001,49 (4):469-487.
[6] J E de Steiguer,Jennifer Duberstein,Vicente Lopes.The Analytic Hierarchy Process as a Means for Integrated Watershed Management[A].First Interagency Conference on Research on the Watersheds[C].Benson:U.S.Department of Agriculture,Agricultural Research Service,2003.736-740.
[7] Jyrki Wallenius,James S Dyer,Peter C Fishburn,et al.Multiple Criteria Decision Making,Multiattribute Utility Theory:Recent Accomplishments and What Lies Ahead[J].Management Science,2008,54(7):1 339-1 340.
[8] Gajpal P P,Ganesh L S,Rajendran C.Critical Analysis of Spare Parts Using the AHP[J].International Journal of Production Economics,35(3):293-297.
[9] Mohamed A Sharaf,Hussein A Helmy.A Classification Model for Inventory Management of Spare parts[A].International Conference on Production Engineering,Design and Control[C].Alexandria:ICPE,2001.499-510.
[10] Thomas L Saaty.Relative Measurement and its Generalization in Decision Making:Why Pairwise Comparisons are Central in Mathematics for the Measurement of Intangible Factors-The Analytic Hierarchy/Network Process[J].RACSAM (Review of the Royal Spanish Academy of Sciences,Series A,Mathematics),2008,102(2):251-318.
[11] Aimone R J,ForsthofferW E,Salzmann R M.Dry gas seal systems[J].Turbomachinery International,2007,(1):20.