盾构法施工中砂层进洞段降水设计与施工
Water Level Lowering Design and Construction at Shield Tunneling Entrance in Sand Stratum
浏览(2264) 下载(1)
- DOI:
- 作者:
- 刘广仁, 常喜平, 寇宝庆, 安冬云, 李应辉
LIU Guang-ren, CHANG Xi-ping, KOU Bao-qing
- 作者单位:
- 中国石油天然气管道局, 河北 廊坊 065000
China Petroleum Pipeline Bureau, Langfang 065000, China
- 关键词:
- 盾构施工;砂层;深井降水;降水设计
shield tunneling;sand stratum;water level lowering with deep wells;water level lowering design
- 摘要:
- 西气东输二线长江盾构隧道穿越工程采用AVND3080泥水平衡式盾构机施工,盾构机进洞段地质条件复杂,属粉质黏土和细砂地层。细砂层具有中、强透水性,给盾构机进洞带来很大的威胁。经多方案比选论证,采用深井降水方案疏干盾构机进洞段地下水,达到盾构安全进洞的目的。
AVND3080 slurry balanced shield machine is used in the Yangtze River tunnel construction of the Second West to East Gas Pipeline Project. The geological condition at the shield tunneling entrance is complex and belongs to silty clay and fine sand stratums. The strong permeability of sand stratum imperils the shield machine when it enters into hole. Through the comparison and discussion for several schemes, the scheme of water level lowering with deep wells is adopted to drain the underground water at the shield tunneling entrance and thus to ensure safety of the shield machine.2012,1(1): 36-38 收稿日期:2010-11-9DOI:10.3969/j.issn.1001-2206.2012.01.011作者简介:刘广仁(1977- ),男,甘肃人,工程师,2001年毕业于中国石油大学(北京),从事盾构施工管理工作.参考文献:
[1] 杨太华.越江隧道工程大型泥水盾构进出洞施工关键技术[J].现代隧道技术,2005,42(2):45-48.
[2] 贾卫波,汤学峰.西气东输管道工程通过长江的技术方案——盾构施工法[J].2011,(4):4-7.
[3] 吴林高.工程降水设计施工与基坑渗流理论[M].北京:人民交通出版社,2004.
[4] 王智勇,周群建.深基坑降水对周边环境影响分析[J].地下工程与隧道,2000,(3):33-35.
[5] 徐秋林.大型建筑深基坑降水设计与施工[J].工程技术,2009,(3):171-172.
[6] 张梅.淤泥质地层下地铁深基坑降水设计与施工[J].工程技术,2009,(11):158-160.