水平定向钻穿越施工中的对接技术
Interconnection Technique of Horizontal Directional Drilling for Pipeline Crossing Construction
浏览(2098) 下载(6)
- DOI:
- 作者:
- 屠言辉, 苗冀清, 徐树枫
TU Yan-hui
- 作者单位:
- 中国石油天然气管道局穿越公司, 河北廊坊 065001
China Petroleum Pipeline Crossing Company, Langfang 065001
- 关键词:
- 水平定向钻;对接技术;控向;钻具组合
horizontal directional drilling;interconnection technique;directional control;drilling tool assembly
- 摘要:
- 在长距离水平定向钻穿越导向孔施工中,由于钻柱与孔壁之间存在较大的摩阻,因此钻头的旋转要明显滞后于钻机动力头的旋转,由此造成井下工具面角难以控制,从而使控向精度受到了影响。为解决此问题,采用了对接技术。文章主要介绍了对接技术的原理及对接时井下钻具的组合方式,并以中俄原油管道黑龙江穿越工程主管道导向孔对接实例加以说明。
In long-distance pilot hole construction, big friction between drill string and bore wall causes that the bit rotation lags behind the rotation of drilling machine power head, so it is hard to control the downhole tool face angle, and the directional control precision is influenced. In order to fix the difficulty of directional control in long-distance pilot hole construction, the interconnection technique comes up. This paper mainly introduces the principle of interconnection technique and the downhole equipment assembly, and gives a living example of Heilongjiang River crossing project, which belongs to the China-Russia crude oil pipeline project, to explain the application of the interconnection technique in horizontal directional drilling.2011,5(5): 26-29 收稿日期:2010-7-7分类号:TE973.4作者简介:屠言辉(1982-),男,安徽宿州人,助理工程师,2009年毕业于中国地质大学(北京)地质工程专业,硕士,从事水平定向钻穿越施工工作.参考文献:
[1]叶文建.水平定向钻穿越施工中的定向控制技术[J].非开挖技术,2007,24(2):45-50.
[2]王瑞,王伯雄,康健,等.水平定向对接穿越及导向技术研究[J].探矿工程,2009,36(9):69-71.
[3]贾伟波,王勇光,刘敏强.定向钻对穿与夯管技术的综合应用[J].建筑机械化,2008,(9):57-60.
[4]蔡亮学,何利民,吕宇玲,等冰平定向钻穿越方案,设计方法研究[J].石油工程建设,2010,(2):1-4,10.
[5]曹晓东,张斌,苏勇.铁秦线羊肠河水平定向钻穿越施工技术[J].石油工程建设,2009,(4):34-37.