海外管道工程设备管理三部曲
Trilogy of Overseas Pipeline Project Equipment Management
浏览(2367) 下载(2)
- DOI:
- 作者:
- 杨春生, 苏俊杰, 张毅, 李宁
YANG Chun-shen
- 作者单位:
- 中国石油天然气管道局第二工程分公司, 江苏徐州 221008
Second Pipeline Engineering Construction Company of China National Petroleum Corp.,Xuzhou 221008
- 关键词:
- 海外管道工程;设备管理;前期准备;施工阶段;后期管理
overseas pipeline project;equipment management;earlier preparation stage;constructionstage;lat ermanagement stage
- 摘要:
- 随着海外管道工程项目的不断拓展,设备管理在工程项目中的重要性更加突出。笔者根据从事海外管道工程施工的经验,总结了设备管理前期准备、施工阶段和项目后期管理这三个阶段中的管理内容、特点和应当注意的事项,为同行提供参考。
With the development of overseas pipeline projects,the importance of equipment management is becoming more obvious.On the basis of the experience in overseas pipeline project construction,the author summarizes the management contents,features and matters for attention in three stages i.e.earlier preparation stage,construction stage and later management stage to offer reference to personnel of the same trade.2011,4(4): 89-91 收稿日期:2010-9-27分类号:TE973,F406.4作者简介:杨春生(1961-),男,河北保定人,高级工程师,1984年毕业于承德石油高等专科学校,现从事石油天然气管道工程管理工作.