国际石油工程联合体承包模式风险分析与应对
Risk Analysis and Countermeasures for International Consortium of Petroleum Project
浏览(2490) 下载(4)
- DOI:
- 作者:
- 陈志勇
CHEN Zhi-yong
- 作者单位:
- 中国石油工程建设公司, 北京 100120
China Petroleum Engineering & Construction Corp.,Beijing 100120
- 关键词:
- 松散型;联合体;风险;风险管理;国际工程
loose consortium;risk;risk management;international project
- 摘要:
- 国内承包商在走出国门与国际承包商及当地承包商联合承接项目的过程中,总存在很多合作问题,这些问题反映出我国承包商对联合体特有风险的研究不足。笔者从我国工程承包公司的角度出发,探讨国际工程松散型联合体中8个方面的风险,并提出应对措施,包括慎重选择联合体合作方,细化联合体协议条款,理顺联合体内部关系及责任,优化联合体组织机构以及合理向联合体各方转移风险。
In the course of forming a consortium by Chinese contractors with international contractors and local contractors to undertake international projects,there are always many problems in cooperation,which reflect inadequate research work on specific risks of consortium conducted by Chinese contractors.In this paper,the author analyzes the special risks of loose consortium in international project regarding 8 aspects from the standpoint of Chinese contractor,and proposes the countermeasures including carefully selecting cooperation partners of consortium,embodying agreement clauses,smoothing internal relationship within consortium and rationalizing responsibility,optimizing consortium organization and rationalizing risk transfer among consortium partners.2011,4(4): 73-76 收稿日期:2011-1-11分类号:F284作者简介:陈志勇(1963-),男,江苏泰兴人,工程师,1987年毕业于江苏广播电视大学工业与民用建筑专业,现从事项目投标报价、项目风险管理及项目成本控制工作.参考文献:
[1] 罗汉卿.涉外工程联合体投标中的责任研究[D] .大连理工大学,2006.
[2] 王守清,柯永建,滕涛.国际工程联合体的风险管理[J] .施工企业管 理,2008,(9):36-37.
[3] 张再良,周旭荣,郭胜军,等.国际EPC项目的风险识别与风险防 范策略[J] .石油工程建设,2010,36(5):75-78.
[4] 王青.浅议工程承包中的项目联合体[J] .建筑经济,2006,(7):95-97.4