16万m~3双层浮顶储罐施工
Construction of 16×10~4m~3 Storage Tanks with Double Deck Floating Roof
浏览(2572) 下载(5)
- DOI:
- 作者:
- 高飞1, 向爱丽2
GAO Fei1
- 作者单位:
- 1. 中国石油工程建设公司, 北京 100120;
2. 黑龙江省大庆市建设集团培训中心, 黑龙江大庆 163712
China Petroleum Engineering and Construction Corp.,Beijing 100120
- 关键词:
- 钢结构储罐;焊接;双层浮顶;正装法
steel structural storage tank;welding;double deck floating roof;upward installation
- 摘要:
- 意大利Belleli公司作为EPC分包商分包了阿布扎比原油管道项目首站的2座16万m3钢制立式双层浮顶原油储罐工程。文章介绍了这两座浮顶储罐的焊接施工过程,对施工方案的制订及重点施工环节进行了详细的论述,并对施工过程中的注意事项和焊接过程中变形的控制措施进行了总结。
Italy Belleli Company has abundant experience in welding construction of crude oil storage tanks,which is helpful to Chinese construction companies.In this paper,the welding construction of two sets of 16 × 104 m3 vertical crude oil storage tanks with double deck floating roof in the initial station of Abu Dhabi crude oil pipeline project is introduced,the construction scheme formulation and key construction links are detailedly discussed,and the matters needing attention during the construction and the measures taken to control the welding deformation are summarized.2011,3(3): 60-62 收稿日期:2010-8-30分类号:TE972.5作者简介:高飞(1983-),男,山西五寨人,工程师,2007年毕业于哈尔滨工业大学市政工程专业,项士,现从事阿布扎比原油管道站场项目分部油气储运工作.参考文献:
[1] API650-2009,Welded Steel Tanks for Oil Storage[S] .
[2] Shell DEP 64.51.01.31-1995,Standard Vertical Tank-Field Erection and Testing[S] .