盾构机掘进中解卡措施研究
Research of Stuck Freeing Measure for Shield Machine in Tunneling
浏览(2167) 下载(1)
- DOI:
- 作者:
- 张焕杰, 刘广仁, 常喜平
ZHANG Huan-jie
- 作者单位:
- 中国石油天然气管道局第四工程分公司, 河北廊坊 065000
China Petroleum Pipeline Fourth Construction Co.,Langfang 065000,China
- 关键词:
- 西气东输二线;盾构机;解卡;参数调整
Second West to East Gas Pipeline;shield machine;stuck freeing;parameter regulation
- 摘要:
- 盾构机在掘进的过程中,由于地层突变等原因易造成盾构机"卡壳",使得盾构机陷入进退两难的困境。文章以西气东输二线长江盾构工程为例,就盾构机"卡壳"的原因进行了详细的分析,并提出增加盾构机的总推力,同时调整掘进参数等盾构机解卡措施,使盾构机成功脱困。
Because of abrupt strata changing,the shield machine may be unable to move during tunneling.This article takes the Yangtze River shield tunneling construction of Second West to East Gas Pipeline Project for example,carries out the detailed analysis of shield machine stuck reasons,and researches the stuck freeing measures of increasing general power of the shield machine and regulating operational parameters.Finally,the shield machine stuck problem is successfully solved.2011,2(2): 67-69,7,8 收稿日期:2010-5-28分类号:TE973.4作者简介:张焕杰(1979-),男,河北廊坊人,工程师,2008年毕业于西南石油大学管理科学与工程专业,硕士,现从事项目管理工作.参考文献:
[1]谭忠盛,洪开荣,万姜林,等.软硬不均地层复合盾构的研究及掘进技术[J].岩石力学与工程学报,2005,25(2):3 945-3 952.
[2]付艳斌.上软下硬地层中盾构法隧道施工技术[[J].交通科技与经济,2009,(4):80-84.
[3]钟志全,杨自华.特殊地段的泥水盾构施工[J].建筑机械化,2007,(8):49-51
[4]宁锐.刘文斌.软硬不均复杂地层的盾构施工技术研究[[J].吉林水利,2009,(9):19-22.
[5]杨书江.盾构在硬岩及软硬不均地层施工技术研究[D].上海:上海交通大学.2006.
[6]史兴全西气东输管道工程大型穿越遇到的技术难题及其对策[J].石油工程建设,2005,(1):43-47.