国际EPC项目的风险识别与风险防范策略
Risk Identification and Prevention Strategy in International EPC Projects
浏览(2236) 下载(8)
- DOI:
- 作者:
- 张再良1, 周旭荣1, 郭胜军1, 贺巧2, 宋宏煜1
ZHANG Zai-liang1, ZHOU Xu-rong1, GUO Sheng-jun1, HE Qiao2, SONG Hong-yu1
- 作者单位:
- 1. 中国石油工程建设公司, 北京 100011;
2. 中国石油大学(华东) 储运与建筑工程学院, 山东青岛 266555
China Petroleum Engineering & Construction Corp.(CPECC),Beijing 100011,China
- 关键词:
- 国际工程;工程总承包;风险识别;风险应对措施
international project;EPC;risk identification;risk response measure
- 摘要:
- 国际EPC项目极富挑战性和风险性,如果忽视风险识别,不采取风险应对措施,很容易出现巨大的经济亏损和不良的社会影响。文章根据以往国际EPC项目管理的成功经验和失败教训,介绍了国际EPC项目的常见风险、风险识别方法与步骤、风险防范总体原则,提出了风险防范措施。
International EPC projects are full of challenges and risks.The neglect of the assessment and management of EPC risks can easily lead to huge economic loss and bad social effect.The assessment basis, assessment methods, assessment procedures, overall principles and 10 strategies to prevent the common risks in international EPC projects are introduced in this paper as per previous successful experience and frustrated lessons.The achievements and experience described in this paper have very important reference sense to EPC bidding, assessment and management of risks, engineering, procurement, construction etc.in international EPC projects.2010,5(5): 75-78 收稿日期:2010-6-25分类号:F746.18;X922作者简介:张再良(1968-),男,湖南宁乡人,高级工程师,1991年毕业于大庆石油学院石油加工专业,主要从事国际石油工程建设EPC项目管理工作。参考文献:
[1] 张学利.EPC 总承包模式下的工程项目管理研究[D].西安:西安建筑科技大学,2008.
[2] 苏志娟. 关于EPC 国际工程项目采购管理的研究[D].北京:北京交通大学,2008.
[3] 孟宪海,赵启.EPC 项目选择总承包商的原则与标准[J].国际经济合作,2005,(7):55-57.
[4] 张吉明,张红.如何快速提高国际石油工程设计水平[J].对外经贸实务,2008,(9):58-61.
[5] 严聪,张红,周旭荣.振冲碎石桩与充水预压联合处理地震区深厚软土地基[J],中南大学学报,2009,40(3):822-826.