西气东输增输工程建设的项目管理
Project Management of Transmission Capacity Increasing Project of West to East Gas Pipeline
浏览(2374) 下载(4)
- DOI:
- 作者:
- 陈向新, 马纳新, 林泊成
CHEN Xiang-xin
- 作者单位:
- 中国石油天然气股份有限公司管道建设项目经理部, 北京 100101
CNPC Pipeline Construction Project Management Department, Beijing 100101
- 关键词:
- 西气东输;增输工程;压气站;分输站;项目管理;经验
the transmission capacity increasing project of West to East Gas Pipeline;compressor station;branch transmission station;project management;experience
- 摘要:
- 西气东输增输工程包括22座压气站和3座分输站,新建站建设与续建站建设和压缩机组改造同期进行,现场各专业配合交叉作业多,管理难度大。文章结合西气东输增输工程建设实践,介绍了工程建设过程中项目管理工作的主要内容和做法,总结了大规模压气站工程建设项目管理的经验和体会。
The transmission capacity increasing project of West to East Gas Pipeline involves 22 compressor stations and 3 branch transmission stations. The constructions of these new built stations and continuous built stations progress in the corresponding period of compressor set reformation. Thus, there are a great amount of specialty cooperation and interlacing work in construction site causing the project management to be difficult. Based on the construction practice of the transmission capacity increasing project of West to East Gas Pipeline, this paper introduces the main contents of the project management and concrete implementation, summarizes the experience and realization of the project management of large scale compressor station construction.2008,5(5): 67-69 收稿日期:2007-6-15分类号:TE9373;F284作者简介:陈向新(1956-),男,山东平度人,高级工程师,2006年毕业于中国石油大学,硕士,现从事石油天然气管道工程项目群建设管理工作.