CFD技术在解决利比亚工程RTU阀室高温问题中的应用
Application of CFD in Solving High Temperature Problem of RTU Valve Chamber in Libya Project
浏览(2209) 下载(1)
- DOI:
- 作者:
- 范艳萍1, 史玉峰1, 马新宇2
FAN Yan-ping1
- 作者单位:
- 1.中国石油天然气管道工程有限公司, 河北廊坊 065000;
2.中国石油管道建设项目经理部, 北京 100000
China Petroleum Pipeline Engineering Corporation (CPPE),Langfang 065000
- 关键词:
- 高温沙漠地区;RTU阀室;温度;传热;计算流体力学(CFD);应用
high temperature desert area;RTU valve chamber;temperature;heat-transfer;computational fluid dynamics (CFD);application
- 摘要:
- 利比亚西部管道工程地处高温沙漠地区,夏季室外最高温度可达44℃,为保证RTU阀室内设备正常工作,解决RTU阀室内部的超温问题,提出利用计算流体力学(CFD)理论和相应的专业软件模拟RTU阀室内的热环境和传热过程,并以此为依据确定了阀室的结构和尺寸,解决了RTU阀室内的超温问题,为类似工程项目提供了一个成功案例和有益的思路。
Libya West Pipeline Project is carried out in the high temperature desert area with the highest air temperature of 44℃. In order to solve the exceeded high temperature trouble of RTU valve chamber in that project so as to ensure smooth operation of the equipment in the chamber, the computational fluid dynamics (CFD) theory and its corresponding software were applied to simulate the thermal environment and heat-transfer process of the RTU valve chamber. Depending on these, the form and dimensions of the valve chamber were determined, and the exceeded high temperature trouble was solved.2008,5(5): 27-29 收稿日期:2008-3-18分类号:035,TE 974作者简介:范艳萍(1973-),女,吉林人,工程师,1996年毕业于武汉水利电力大学.现从事暖通空调及燃气专业工作.参考文献: