16万m3LNG混凝土外罐施工控制要点
Key Points of Construction Control for 16×104m~3 LNG External Concrete Tank
浏览(2204) 下载(1)
- DOI:
- 作者:
- 邸国清
DI Guo-qing
- 作者单位:
- 中油管道建设工程有限公司, 河北廊坊 065000
China Petroleum Pipeline Construction Corporation,Langfang 065000,China
- 关键词:
- 液化天然气;承台;罐体;穹顶;预应力
liquefied natural gas;bearing platform;tank body;dome;prestress
- 摘要:
- 文章结合福建16万m3LNG混凝土外罐现场施工实例,分别从混凝土承台、墙体、罐穹顶施工以及预应力施工等方面进行了分析和总结,详细介绍了16万m3混凝土外罐施工中的控制要点,为以后混凝土储罐施工提供了参考。
Combining with the site construction case of 16 × 104 m3 LNG external concrete tank in Fujian, this paper analyzes the constructions of the concrete bearing platform, concrete wall, concrete tank dome and the prestressing construction. And it introduces in detail the technical control points during the construction. Such experience will benefit similar concrete tank constructions.2008,4(4): 30-33,5 收稿日期:2007-11-30分类号:TE972作者简介:邸国清(1975-),男,河北安新人,工程师,1998年毕业于江汉石油学院,现从事工程管理工作.