海外石油工程风险评价系统功能分析及软件开发
Functional Analysis and Software Development of Risk Assessment System for Overseas Petroleum Engineering
浏览(2289) 下载(2)
- DOI:
- 作者:
- 王坚, 金玉清
WANG Jian, JIN Yu-qing
- 作者单位:
- 中国石油工程建设公司, 北京 100011
China Petroleum Engineering and Construction Corp., Beijing 100011, China
- 关键词:
- 国际石油工程;风险评价;风险金测算;NN-BP模型;风险管理
international petroleum engineering;risk assessment;risk fund estimation;NN-BP model;risk management
- 摘要:
- 随着国际高端石油工程建设的发展,发达国家业主在招标文件中明文要求总包单位提供风险管理计划和建立相应的管理制度。文章根据国际风险管理标准和海外石油工程的业务背景,对投标阶段的风险管理进行研究,提出投标阶段风险识别、风险量化评估、处置方法及风险管理流程,据此进行软件系统功能设计并开发成风险决策支持系统。
With the development of international high-end petroleum engineering, the documents to invite public bidding offered by owners from developed countries demand the general contractors to present risk management plan and to establish corresponding management system. According to the international risk management standards and based on the overseas petroleum engineering background, this paper studies the risk management in bidding phase, puts forward the methods of risk identification, risk quantified assessment, risk treatment and risk management process in bidding phase. Hereby the functional design of a software system is conducted and the risk decision-making support system is developed.2009,06(06): 69-73 收稿日期:2008-12-24分类号:F416.22作者简介:王坚(1975-),男,浙江平阳人,工程师,清华大学建设管理系06级硕士研究生,研究方向为工程风险管理。参考文献:
[1] 金英, 李嗣勤. 国际工程总承包的风险管理 [J]. 国际经济合作,2003,(3):45-47.
[2] AS/NZS 4360-2004, Risk management[S].
[3] 杨宝君. 国际油气勘察开发项目的风险管理研究 [D]. 哈尔滨:哈尔滨工业大学,2003.
[4] Hecht Nielsn R. Theory of the Back-Propagation NN [A]. Pro. IEEE.International Conference on NN[C]. 1999.593-605.
[5] 王坚. 基于 GA+BP 的工程报价风险金测算的模型研究[J].石油工程建设,2009,35(1):66-68.
