管道悬索跨越的主索下料和安装
Length Calculation and Installation of Main Cables of Suspension Cable Structure for Pipeline Crossing
浏览(2201) 下载(1)
- DOI:
- 作者:
- 吴香然1, 庞伯贤2
WU Xiang-ran1, PANG Bo-xian2
- 作者单位:
- 1. 渤海石油职业学院, 河北任丘 062552;
2. 河北华北石油工程建设有限公司, 河北任丘 062552
Bohai Petroleum Vocational Institute, Renqiu 062552, China
- 关键词:
- 管道;悬索跨越;主索线形;主索下料计算;施工安装
pipeline;suspension cable crossing;main cable line pattern;length calculation of maincable;construction and installation
- 摘要:
- 贵州开磷矿浆管道的丁家田跨越采用悬索跨越结构,按设计要求,主索锚固墩必须置于未风化岩层中,因工程地质条件不满足设计要求,主索锚固墩须向山体内部移位。文章阐述了主索锚固墩移位后,主索线形的确定方法、主索的下料计算以及施工工艺等内容。采用该方法进行计算和施工,主索挠度符合设计要求,保证了施工质量。
The suspension cable structure is applied in Dinjiatian crossing of the phosphorite slurry pipeline of Guizhou Kaiyang Phosphorite Group Company. The design requires that the main cable abutments must be placed in unweathered terrane, but the engineering geological conditions on site don’t meet the design requirement so that the main cable abutments must be shifted into the hill with more distance. This paper illustrates the line pattern determination method of the main cables after the abutment shift, the length calculation of the main cables and their installation process. By this calculation and construction methods, the bending deflection of the main cable meets the design requirement, and the construction quality is ensured.2010,1(1): 22-24 收稿日期:2008-12-18分类号:TE973.94作者简介:吴香然(1972-),女,河北任丘人,讲师,1996年毕业于河北师范大学数学系,现在渤海石油职业学院任教.参考文献:
[1] 薛标.安装起重工[M] .北京:中国劳动社会保障出版社,1999.
[2] 孙训方,方孝淑,关来泰.材料力学[M] .北京:高等教育出版社,1987.
[3] 贺栓海.桥梁结构理论与计算方法[M] .北京:人民交通出版社,2003.