松南气田外输管道工程焊接质量控制
Welding Quality Control for Gas Transmission Pipeline Project in Songnan Gas Field
浏览(2088) 下载(2)
- DOI:
- 作者:
- 夏先德
Xia Xiande
- 作者单位:
- 中石化东北油气分公司, 吉林长春 130062
Sinopec Northeast Branch, Changchun 130062, China
- 关键词:
- 长输管道;焊接;质量控制
long-distance transmission pipeline;welding;quality control
- 摘要:
- 松南气田外输管道工程是松南气田10亿m3/a燃气产能建设项目配套工程的重点、难点。在管道焊接施工中,通过实施有效的气孔、夹渣控制措施,不但按时完成了任务,而且保证了施工质量。焊口X射线检测一次合格率为97.3%,超声波检测一次合格率为99.4%,管道通球、试压一次成功,投产一次成功。
The Gas Transmission Pipeline Project in Songnan Gas Field is a major and difficult task of the matching subproject of the 10×108 m3 natural gas production capacity-building project in Songnan Gas Field. In the pipeline welding construction, with the effective measures to control welding bubbles and enclosed slag, the welding task was fulfilled on schedule and the welding quality was ensured. The primary qualified rate of welds was 97.3% by X-ray detection and 99.4% by ultrasonic testing. The first ball-passing test and pressure test for the pipeline were successful and the pipeline was put into operation soon after2009,03(03): 63-64 收稿日期:2008-11-15分类号:TE973.3作者简介:夏先德(1968-),男,湖北仙桃人,高级工程师,1988年毕业于郑州大学工业工程专业,从事油气田地面工程建设工作。参考文献:
[1] 张文钺. 焊接冶金学(基本原理)[M]. 北京: 机械工业出版社,1997,10.
[2] 王晓君.浅析长输管线焊接质量的保证[J].石油化工设备技术, 2008,29(3):54-56.
[3] 张峰,衣粟,祝卫国.长输压力管道焊接及其质量控制[J].焊接质量控制与管理,2005,34(2):57-59.
[4] 陈自振,吕向阳.向下焊工艺技术及焊接缺陷分析[J].焊工之友,2002,31(4):57-58.