山区油库工程平面及竖向设计优化
Plane and Vertical Design Optimization of Oil Depot Project in Mountainous Area
浏览(2345) 下载(3)
- DOI:
- 作者:
- 宋伟, 曹婧, 宋华, 李非, 石岩
SONG Wei, CAO Jing
- 作者单位:
- 中油辽河工程有限公司, 辽宁盘锦 124010
PetroCina Liaohe Engineering Co., Ltd., Panjin 124010, China
- 关键词:
- 油库;平面设计;竖向设计;土石方平衡;优化
oil depot;plane design;vertical design;earthwork equilibrium;optimization
- 摘要:
- 文章以大连中石油国际储备库北区工程为例,阐述了在高差较大的山区地形基础上进行油库平面及竖向设计的优化方法。利用数学模拟分析的方法进行土方平衡,获得了最佳竖向设计方案;按照优化的结果采用阶梯式的平面及竖向布置、网箱填方边坡防护的技术措施,取得了降低工程投资和缩短施工工期的效果。
Taking the north zone project of CNPC International Oil Storage Depot in Daliang for example, this paper introduces the optimization method of oil depot plane and vertical design in the mountainous area with large height difference. Applying mathematic simulation method for earthwork equilibrium obtains the optimal vertical design scheme, and using stepped plane and vertical configuration as well as the soil filled net cages for slope protection realizes the target of reducing engineering investment and shortening construction period.2010,1(1): 106-108 收稿日期:2009-10-26分类号:TE972作者简介:宋伟(1972-),男,辽宁盘锦人,工程师,1993年毕业于哈尔滨测量高等专科学校,现主要从事总图运输设计工作.参考文献: