水平定向钻穿越方案设计方法研究
Research on Design Methods for Pipeline Crossing with Horizontal Directional Drilling
浏览(2671) 下载(6)
- DOI:
- 作者:
- 蔡亮学, 何利民, 吕宇玲, 薛振兴
CAI Liang-xue
- 作者单位:
- 中国石油大学油气储运与建筑工程学院(山东青岛) 266555
School of Storage Transportation and Architectural Engineering,China University of Petroleum,Qingdao 266555,China
- 关键词:
- 水平定向钻;穿越方案;垂直平面法;斜平面法;动态规划法
horizontal directional drilling;crossing scheme;vertical plane method;oblique plane method;dynamic programming method
- 摘要:
- 水平定向钻穿越方案的设计,目前多依靠施工队伍的经验来完成,缺乏必要的理论依据。文章从入土点选取与曲线结构优化两个方面对比分析了垂直平面法、斜平面法和动态规划法三种水平定向钻穿越方案的设计方法,修正了现行的垂直平面法。分析表明,入土点应根据钻机场地要求与地质条件进行选取;垂直平面法最具实际应用价值,并解决了现行方法所得曲线不光滑问题;扩孔比是方案设计的-项重要参数,与穿越管道的管径、长度以及施工队伍的水平有定性关系。
At present, the scheme design of pipeline crossing, as the first step of horizontal directionaldrilling (HDD) construction, depends mostly on the experience of contractor and is lack of necessary theories.For this issue, the paper presents a comparison of three design methods including vertical plane, oblique planeand dynamic programming in two aspects of drilling entrance selection and bore-path profile optimization, andrevises the present vertical plane method. The analysis shows that the drilling entrance point should be deter-mined according to rig site requirement and geologic condition; the method of vertical plane is the most rea-sonable one for field construction; the problem of unsmooth bore-path profile resulting from the present verti-cal plane method is solved; the reaming ratio is an important parameter in the scheme design which has aqualitative relationship with pipe diameter, crossing length and skill level of contractor.2010,2(2): 1-4 收稿日期:2009-9-7分类号:TE973.4作者简介:蔡亮学(1984-)男,山东临胸人,现为中国石油大学博士研究生,从事油气管道水平定向钻敷设技术研究。参考文献:
1 宗全兵,张祖培,李月莲. 非开挖导向钻进钻孔轨迹的优化设计[J].西部探矿工程,2000,(03):93-94.
2 Baumert M E,Allouche E N.Methods for estimating pipe pullback loads for horizontal directional drilling(HDD)crossings[J].Journal of Infrastructure Systems,2002,(01):12-19.
3 Cheng E,Polak M A.Theoretical model for calculating pulling loads for pipes in horizontal directional drilling[J].Tunnelling and Underground Space Technology,2007,(5-6):633-643.doi:10.1016/j.tust.2007.05.009.
4 闫相祯,丁鹏,杨秀娟.水平定向钻技术在管道穿越工程中的应用研究[J].石油学报,2008,(02):292-295.doi:10.3321/j.issn:0253-2697.2008.02.026.
5 蒋国盛,张家铭,窦斌.定(导)向钻进的轨迹设计[J].地质与勘探,2000,(02):13-15.doi:10.3969/j.issn.0495-5331.2000.02.005.
6 鲁琴.非开挖水平定向钻进轨迹设计与调控技术研究[D].长沙:国防科学技术大学,2004.25-29.
7 周从明,黄中权. 非开挖水平定向钻进软件设计研究[J].煤田地质与勘探,2005,(01):76-78.doi:10.3969/j.issn.1001-1986.2005.01.024.
8 GB 50423-2007,油气输送管道穿越工程设计规范[S].
9 GB 50424-2007,油气输送管道穿越工程施工规范[S].